Al-Russ OCS
- Main Contractor: Randa for contracting and trading co.
- Owner: Al Qaseem directorate of water
Odor control system for Al- russ STP
Integration of 8 Odor control units,
- Scope: design, supply, install, test and commissioning of automation panels and integrate added signals into existing PLC/SCADA system
PLC: Schneider Modicon M340.
SCADA: Wonderware InTouch